[12-11 17:00:02] 来源:http://www.tmgc8.com 水利水电 阅读:3347次
参 考 文 献:
[ 1 ] 陈厚群.大坝的抗震设防水准及相应性能目标[J].工程抗震与加固改造,2005,(12):1-6.
[ 2 ] Wang Yongxi. Multimechanism Theory of Reservoir-Induced earthquake and its application in reservoir seismic riskassessment [A]. Proceedings of the International Symposium on Reservoir-Induced Seismicity[C]. Beijing, 1995. 108-
[ 3 ] 陈厚群,郭明珠.重大工程场地设计地震动参数选择[A].现代地震工程进展[C].南京:东南大学出版社,2002. 25-39.
[ 4 ] 陈厚群,李敏,石玉成.基于设定地震的重大工程场地设计反应谱的确定方法[J].水利学报,2005,36(12):1399-1404.
[ 5 ] Nakayama T, Fujiwara H, Komatsu S,Sumida N.Nonstationary response and reliability of linear systemsunder seismicloadings[A]. Schueller,Shinozuka&Yao.Structural Safety&Reliability[C].Balkema,Rotterdam,1994. 2179-2186.
[ 6 ] Kameda H, Sugito M, Asamara T. Simulated earthquake motions scaled for magnitude, distance and local soil conditions[A]. Proceedings of the 7th World Conference on Earthquake Engineering[C].1980.295-302.
[ 7 ] Zhang Cuiran, ChenHouqun, Li Min. Earthquake acceleration simulationwith statistical lawof power spectrum[J]. ActaSeismologica Sinica, 2007,(4):435-446.